Commercial Building Decarbonisation: Hot Water & Heat Pumps

Commercial services · Explore hot-water systems

Building owners & facilities teams · Greater Wellington

Replacing gas hot water or ageing heating plant?

Commercial building decarbonisation starts with understanding where the building uses energy. Hot water, space heating and cooling each need a clear plan. For Wellington property owners, heat pumps are worth assessing when a gas boiler is due for replacement, hot-water demand changes or a major refurbishment is coming up.

What does decarbonisation mean for a commercial building?

For heating and hot water, decarbonisation means reducing the greenhouse-gas emissions associated with providing that heat. Improving efficiency and replacing fossil-fuel heating with suitable electric heat pumps can form part of that work. A heat pump moves heat from a source such as outdoor air into the water system, using electricity to drive the process.

EECA identifies commercial hot-water heat pumps as an option for reducing energy use and emissions. Actual savings depend on the fuel being replaced, electricity supply, operating temperatures and system performance. Read EECA’s overview of hot-water heat pumps in commercial buildings.

Separate hot water from building heating and cooling

  • Domestic hot water (DHW): water used at taps, showers and other sanitary outlets. “Domestic” describes the use of the water, even in a hotel, school, gym or commercial building.
  • Space heating: water serving radiators, heating coils or other hydronic equipment. Existing water-temperature requirements need to be checked before changing the heat source.
  • Cooling: chilled water serving cooling coils or process equipment. A cooling-only chiller does not replace a heating boiler.

This distinction helps avoid choosing equipment by its name or nominal capacity alone. Dedicated hot-water plant and reversible building heat pumps solve different parts of the project.

Four heat-pump options to discuss

Mitsubishi Electric QAHV CO₂ hot-water heat pump — manufacturer image
Product image: Mitsubishi Electric.

Mitsubishi Electric QAHV: commercial domestic hot water

QAHV is a CO₂ hot-water heat pump with a nominal 40 kW heating capacity and published hot-water production up to 90°C. It is designed for potable hot water, making it a system to assess where a building has substantial sanitary hot-water demand.

Explore QAHV commercial hot water
View the QAHV product

Mitsubishi Heavy Industries Q-ton CO₂ hot-water heat pump — manufacturer image
Product image: Mitsubishi Heavy Industries.

Mitsubishi Heavy Industries Q-ton: commercial hot water

Q-ton is a three-phase CO₂ hot-water heat pump with a published 30 kW heating capacity and 60°C–90°C hot-water range. It is another option to assess for commercial hot-water projects. Mitsubishi Heavy Industries and Mitsubishi Electric are separate manufacturers.

Explore Q-ton hot-water systems
View the Q-ton product

Daikin 250 L and 315 L hot-water storage tanks — manufacturer image
Product image: Daikin New Zealand.

Daikin CO₂: smaller hot-water systems

Daikin pairs its CO₂ outdoor unit with 250 L or 315 L storage options. The range is primarily presented for household hot water. For a small business, commercial suitability, recovery capacity and warranty must be confirmed with Daikin for the proposed duty.

Explore Daikin CO₂ hot water
View the 250 L and 315 L systems

Mitsubishi Electric e-Series YCL modular chiller — manufacturer image
Product image: Mitsubishi Electric.

Mitsubishi Electric e-Series: heating and cooling plant

The featured e-Series YCL range uses R32 refrigerant and includes cooling-only EACV chillers and reversible EAHV heat pumps. EAHV can be assessed for suitable hydronic heating and cooling duties. It is a separate selection from a dedicated CO₂ domestic-hot-water system.

Explore e-Series chillers and heat pumps
Read about chiller replacement

Published capacity is a starting point. Equipment must be selected at the site’s required water temperatures and outdoor design conditions. Storage volume, peak demand and available recovery time also affect the complete system.

What should a gas-boiler replacement assessment cover?

  1. The building’s demand. Gather energy bills, operating hours, hot-water usage and existing plant information. Identify the busy periods and the services that must stay running.
  2. Opportunities to reduce waste. Review operating schedules, controls and avoidable heat losses before sizing replacement plant. EECA’s commercial buildings pathway starts with understanding and improving energy performance.
  3. The complete installation. Review tanks, pipework, water temperatures, electrical capacity, controls, access, noise and maintenance space. Agree how the new equipment connects to the existing building.
  4. Cost and emissions assumptions. Compare options using the same demand profile, tariffs, seasonal performance and current emissions factors. Include installation, electrical upgrades and ongoing maintenance in the assessment.
  5. Delivery and verification. Agree shutdown windows, any temporary services, commissioning and handover records. Decide how energy use and performance will be checked after the upgrade.

Why storage and operating conditions matter

A hot-water system needs to cover peak draw-off as well as daily consumption. Storage and recovery capacity should therefore be assessed together. EECA also highlights the influence of electricity capacity and time-of-use or peak-demand charges. A larger unit is not automatically the best whole-system answer.

For hydronic building heating, review the temperatures needed by the existing emitters and coils. Manufacturer selection data and the building’s design requirements should guide the decision. EECA’s high-temperature heat-pump guidance is a useful starting reference for project teams.

Planning a decarbonisation project in Wellington

Winter AC can assess the existing mechanical installation and help define a practical replacement scope. Our work covers HVAC, mechanical pipework, in-house electrical, controls, installation and ongoing maintenance. We work with your consultant and the equipment supplier to confirm selection, interfaces and commissioning responsibilities.

We support projects across Wellington, Lower Hutt, Upper Hutt, Porirua and Kāpiti. A commercial site audit is a useful first step when the plant condition, operating requirements or available records need checking.

Common questions about commercial decarbonisation

Can a heat pump replace our existing gas boiler?

It may be suitable, depending on what the boiler serves and the required duty. Send us the plant details, water temperatures, operating hours and site location so the replacement options can be assessed.

Can we keep our existing hot-water tanks?

Possibly. Tank condition, connections and compatibility with the proposed system need review. We would confirm that during assessment rather than assume every existing cylinder can be retained.

How much will we save?

We would need the building’s demand, fuel bills and proposed system selection to estimate savings. A brochure efficiency rating alone is not an annual operating-cost or payback calculation.

Can the work be completed in stages?

We can assess a staged programme around access, budget and continuity requirements. The proposal should identify what each stage delivers and how it fits the eventual system.

Start with your building.

Send the site address, current boiler or cylinder details, photos, recent energy bills and your target timeframe. We can discuss a site assessment and the information needed for a clear proposal.

Discuss a decarbonisation projectCall 04 390 0441

Manufacturer information and further reading

Product information checked 5 November 2026. Confirm current models, operating limits and project suitability during selection.